1. Size: 1/8"-4"
2. Pressure Rating: 1500LBS, 2000LBS, 3000LBS, 6000LBS, 9000LBS
3. Material: Carbon steel, alloy steel, stainless steel
(1)Carbon Steel: ASTM A694 F42, F46, F52, F56, F60, F65, F70
(2)Stainless Steel: ASTM A182 F304/304L, F316/316L, F316H, F310, F321, F44(UNS S31254)
(3)Alloy Steel: ASTM A182 F1, F5a, F9, F11, F12, F22, F91
(4)Special Alloy: Inconel 600, Inconel 625, Inconel 718, Inconel X-750, Incoloy 800, Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K-500
1. Size: 1/8"-4"
2. Pressure Rating: 1500LBS, 2000LBS, 3000LBS, 6000LBS, 9000LBS
3. Material: Carbon steel, alloy steel, stainless steel
(1)Carbon Steel: ASTM A694 F42, F46, F52, F56, F60, F65, F70
(2)Stainless Steel: ASTM A182 F304/304L, F316/316L, F316H, F310, F321, F44(UNS S31254)
(3)Alloy Steel: ASTM A182 F1, F5a, F9, F11, F12, F22, F91
(4)Special Alloy: Inconel 600, Inconel 625, Inconel 718, Inconel X-750, Incoloy 800, Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K-500
Material | stainless steel, carbon steel, alloy steel |
Size | 1/8"-4" |
Standard | ANSI B16.11 GB14626-93 GB14383-93 HGJ 10-88 |
Pressure | 1500LBS, 2000LBS, 3000LBS, 6000LBS, 9000LBS |
Surface Treatment | anti-corrosive oil, black painted, galvanized or as per customer’ s request |
Marking | standard or as customer’ s need |
Inspection | in-house or the third party |
Application | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction |
Delivery Time | usually within 25-30 days after we have confirmed your order |
MOQ | 10 pieces or as your requirement |
Packing | To be packed in pallet and wooden cases or according to clients' requirement |
Productivity | 300000 tons per year |
Material | stainless steel, carbon steel, alloy steel |
Size | 1/8"-4" |
Standard | ANSI B16.11 GB14626-93 GB14383-93 HGJ 10-88 |
Pressure | 1500LBS, 2000LBS, 3000LBS, 6000LBS, 9000LBS |
Surface Treatment | anti-corrosive oil, black painted, galvanized or as per customer’ s request |
Marking | standard or as customer’ s need |
Inspection | in-house or the third party |
Application | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction |
Delivery Time | usually within 25-30 days after we have confirmed your order |
MOQ | 10 pieces or as your requirement |
Packing | To be packed in pallet and wooden cases or according to clients' requirement |
Productivity | 300000 tons per year |