YZF-P45
ANSI B16.9, ANSI B16.28, MSS SP-43, MSS SP-75
NJP
300000 Tons Per Year
Jiangsu, China
Standard Exporting Package
| Material | Carbon Steel, Alloy Steel, Stainless Steel |
| Size | 1/8” -6” |
| Wall Thickness | Sch5-Sch160, STD, XS, XXS |
| Surface | Hot Dipped Galvanized, Electro Galvanized, Natural finished, Chemical black |
| Standard | ANSI B16.9, ANSI B16.28, MSS SP-43, MSS SP-75 |
| Marking | standard or as customer’ s need |
| Inspection | in-house or the third party |
| Application | Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, etc |
| Delivery Time | within 25-30 days after we have confirmed your order |
| MOQ | 30 pieces or as your requirement |
| Packing | wooden cases or wooden pallets or as per customer' s requirement |
| Productivity | 300000 tons per year |
| Material | Carbon Steel, Alloy Steel, Stainless Steel |
| Size | 1/8” -6” |
| Wall Thickness | Sch5-Sch160, STD, XS, XXS |
| Surface | Hot Dipped Galvanized, Electro Galvanized, Natural finished, Chemical black |
| Standard | ANSI B16.9, ANSI B16.28, MSS SP-43, MSS SP-75 |
| Marking | standard or as customer’ s need |
| Inspection | in-house or the third party |
| Application | Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, etc |
| Delivery Time | within 25-30 days after we have confirmed your order |
| MOQ | 30 pieces or as your requirement |
| Packing | wooden cases or wooden pallets or as per customer' s requirement |
| Productivity | 300000 tons per year |
Home | About Prosper | Products | News | Manufacturing | Customer | Service | Contact Us