YZF-F006
A193 B7/ A320+A194 2H GR. 4 OR7
NJP
3000000 Tons Per Year
Jiangsu, China
Standard Exporting Package
Material | ASTM A193/A320/A193M/A320M B7--B16-B7M-L7-L7M |
Size | 1/2" -2" or M6-M50 |
Standard | A193 B7/B16/B8M; A1942H/8/8F |
Grade | B7-L7-B16 |
Finish | zinc plating, blackening, hot dip zinc, yellow zinc plating, environment-friendly zinc plating and special lubricate coating |
Marking | standard or as customer' s need |
Inspection | in-house or the third party |
Application | chemical industry, petroleum industry, construction industry, domestic installation, and so on |
Delivery Time | usually within 25-30 days after we have confirmed your order |
MOQ | 100 pieces or as your requirement |
Packing | Bulk packing or small boxes packing in cartons then on pallets oras per your requirement |
Productivity | 3000000 tons per year |
Material | ASTM A193/A320/A193M/A320M B7--B16-B7M-L7-L7M |
Size | 1/2" -2" or M6-M50 |
Standard | A193 B7/B16/B8M; A1942H/8/8F |
Grade | B7-L7-B16 |
Finish | zinc plating, blackening, hot dip zinc, yellow zinc plating, environment-friendly zinc plating and special lubricate coating |
Marking | standard or as customer' s need |
Inspection | in-house or the third party |
Application | chemical industry, petroleum industry, construction industry, domestic installation, and so on |
Delivery Time | usually within 25-30 days after we have confirmed your order |
MOQ | 100 pieces or as your requirement |
Packing | Bulk packing or small boxes packing in cartons then on pallets oras per your requirement |
Productivity | 3000000 tons per year |
Home | About Prosper | Products | News | Manufacturing | Customer | Service | Contact Us