2323_03     +86 25 5861 2095

2323_06   gm@njprosper.com
 
 

Product Catalog

Contact Us

Country/Region: China Jiangsu
Address: No. 42 Park Road, Nanjing. P. R. China
Tel: +86 25 5861 2095, +86 25 6887 6162
Fax: +86 25 5861 2092
Email:  gm@njprosper.com
Contact Person: Mr. Victor Fung
 
You are here: Home » Product List » Stainless Steel Manifolds » Pump  Manifold    (YZF-M31)
back

Pump Manifold (YZF-M31)

Pump Manifold  (YZF-M31)
Model: YZF-M31
Trademark: NJP
Standard: ASME/ ANSI, API, DIN, GOST, BS, AS, JIS, JPI,ect.
Unit: PC
Origin: Jiangsu, China
Unit Price: According to the drawing /PC
Productivity: 10000 Tons Per Year
Min order: 10
Packing: Standard Exporting Package
Product Description:

1. Material: Stainless steel 304, 304L, 316, 316L, etc
2. Standard: ASME/ ANSI, API, DIN, GOST, BS, AS, JIS, JPI,ect.
3. Pressure11,16,21,25bar, etc.

Our SS manifolds are mainly used in pump systems and water treatment systems. Besides, we also can manufacture SS Fittings like Nipple, Cap, Elbow, Tee, Reducers Union, Adaptor which are used on Pumping System.
 
We focus on the stainless steel manifolds for over 10 years and usually export to Europe, Canada, The Mid East, America, Southeast Asia and Australia. Especially in Australia and Spain, our manifolds are highly accepted.For now, the max size of manifolds we produced reach to 16''. Over 200 types of pump manifolds have been developed. 
 
We accept all the customized stainless steel products orders. Welcome to contact and send us the drawings. Or you can provide the parameter, we can draw for you!

Technique parameter:
Diameter 20mm~406.4mm
Length 200mm~6000mm or as your demands
Wall Thickness 1.0mm-5.0mm
Diameter of Branch Pipe 1/8"~3" or Customized
Connection Way Thread, Flange, Groove
Standard According to your drawing
Application Pump system,water treatment system,floor heating system,etc
Surface Treatment Electrolytic polishing , pickling and passivation,brushed or as your requirements
Package Wooden Cases/Wooden Pallets/as your demands
Marking Standard or as customer's needs
Inspection In-house or the third party
Delivery Time Usually within 25-30 days after we have confirmed your order.

Related Products:

google translation